Mineta San Jose International Airport Terminal Area Improvement Program
Summary
- 12 days’ worth of pre-construction photography and video documentation
- Constructed a web-based library to display the photographs that were taken during the preconstruction phase
- Designed a unique photo grid to display GPS coordinates of each photo taken
- Documented the construction phase with updates to video on a monthly basis
- Installed six time-lapse cameras in different locations that documented construction in progress